13 Tee Exapansion Completed

The goal for this project was to enlarge the tee surface in addition to creating a barrier to blocking the fence line and background behind tee.  Green Giant arborvitaes were planted on a raised berm to provide an instant screen all year long. Drip line was installed looping around each arborvitae to provide sufficient water for accelerated growth over the next few years. The tee surface itself was expanded 1,400 sq. ft. along the back and right side. Sod was removed from the front left part of three fairway for the expansion and this area was then sodded to rough as per McDonalds completed redesign of hole three.  Irrigation pipe was rerouted to maintain the correct spacing for each individual head and two new quick connects for hand watering were installed. 

Berm creations
 
 
13 tee expansion leveling and irrigation routing
 
 
Sod for the tee used from the front left section of 3 fairway
 
3 fairway after sod removal
 
Back of tee

Completed expansion
 
New Arborvitaes
 