Wednesday, March 13, 2013

A glimpse at the new bunkers on hole 3 pre snow and rain

Sod was installed around the bunker prior to sand being added to prevent soil contamination on the drain lines 
                            


Sand was then added to a 6" depth and compacted to a depth of 4"

No comments:

Post a Comment