Wednesday, March 13, 2013
A glimpse at the new bunkers on hole 3 pre snow and rain
Sod was installed around the bunker prior to sand being added to prevent soil contamination on the drain lines
Sand was then added to a 6" depth and compacted to a depth of 4"
No comments:
Post a Comment
Newer Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment